Meeting Renovation
The Friends Meeting of Washington undertook over 10 years of discernment, discussion, and planning for a major renovation of our space. Through this process, Friends envisioned a renovation of our Meeting that meets three important goals:
Accessibility: We installed an elevator and passageways to connect the three buildings on our campus to each other (the Meetinghouse, Quaker House, and Carriage House).
Environmental Stewardship: We made our gardens even more beautiful, functional, and accessible, while fixing long-standing drainage problems and reducing the amount of stormwater runoff from our property that enters DC’s sewer system following a rain storm.
Inclusivity and Welcoming: Through the above goals, we made our campus more inclusive of our members and attenders of all ages, including those with physical disabilities or mobility issues. We are also provide a more welcoming space to visitors and other space users from the community.
How did we get here?
1930: Meetinghouse constructed. Totally inaccessible to those with physical limitations
1950: Meetinghouse expanded, including new Library, Decatur Place, and Terrace Rooms
1956: Ramp to Meeting Room north entrance added, making it accessible. Parlor and Library also accessible, via that entrance to the Meeting Room
1970: Meeting purchases Quaker House, Carriage House, and grounds
2002: Faith, Facilities, and Financial Realities (FFFR) process initiated to begin prayerful consideration of our renovation needs.
2003: FFFR Committee recommended that Meeting House be made accessible and our facilities used to greatest extent possible. Recommends Capital Campaign be organized.
2004: Threshing sessions, visits with Friends from other Meetings that had recently undertaken renovations, and visits to these Meetings
2006: Quaker fundraising consultant engaged to help determine whether FMW could mount this renovation effort and raise the needed funds
2006: Meeting for Business approved the expenditure of funds on early design concepts
2008: Financing meetings with the School for Friends and other Quaker organizations to explore tenancy options
2010: Capital Campaign launched
2012: Meeting for Business approves current plan concept and we engage Quaker architect Evan Lippincott and architecture and engineering firm Gauthier Alvarado Associates to move the design forward.
2013: Schematic Design set completed, showing addition and back garden design. Construction cost estimate $1.7 million
2014: Design Development set complete showing additional project details. Construction cost estimate $1.8 million
2015: Progress set civil engineering (stormwater and drainage) plans completed. Construction cost estimate grows to $2.7 million. Extended discussion of possible cost reduction changes.
2016: Bid set completed. Construction estimate grows to $2.9 million.
2017: Permit set completed and submitted to the DC government for permitting. Estimated construction contract grows to $3.8 million. Meeting approves borrowing up to $3.5 million. Mortgage negotiated with Sandy Spring Bank. Storm water management plan greatly revised.
2018: Contract negotiations with Monarc Construction begin the year, with rough contract cost estimate of $3.6 million. Construction set to begin in April and take about a year.
Why was it needed?
The following 2014 videos provide an overview of the renovation project and how the FMW campus will benefit:
FMW Renovation Plans (3 minutes)
FMW Renovation Walkthrough (10 minutes)
Full video including history of the buildings (27 minutes)
The project described in these plans is the final project as constructed, except that:
We did not merge the remaining half of the Parlor with the Library, but kept a smaller Parlor space and the present Library.
We added a new room in the current open deck space between Carriage House and Quaker House.
There is a 400-square-foot bioretention pond to capture stormwater at the lower end of the East Garden.
We enlarged the Assembly Room by replacing the wall between it and the Children’s Library space with a folding wall, and we upgraded the floor, ceiling, lighting and HVAC to make it a more spacious and attractive space.
2019 Construction Updates
September 8
September 1
August 25
August 18
August 11
August 4
July 28
July 21
July 14
July 7
June 30
June 23
June 16
June 9
June 2
May 26
May 19
May 12
May 5
April 28
April 21
April 14
April 7
March 31
March 24
March 17
March 10
March 3
February 24
February 17
February 10
February 3
January 27
January 20
January 13
January 6
2018 Construction Updates
September 30
September 23
September 16
September 9
September 2
August 26
August 19
August 12
August 5
July 29
July 22
July 15
July 8
December 30
December 23
December 16
December 9
December 2
November 25
November 18
November 11
November 4
October 28
October 21
October 14
October 7
April 8
April 1
March 25
March 18
March 11
March 4
February 25
February 18
February 11
February 4
Pre-2018 Construction Updates
October 2017 Update
October 2016 Update
May 2013 Update
June 2012 Concept Plans
June 2011 Proposal